![](../images/spacer.gif) | ![](../images/line.jpg) |
Capacity
The new
revitalized railroad consist of a 47-mile single-line track linking Balboa and
Colon with track for two-way traffic at strategic locations. Trains can operate
continuously between the Atlantic and Pacific intermodal terminals with capacity
for 10 trains each direction every 24 hours, and the possibility to increase to
32 daily train runs. The
handling capacity of the railway in Phase I is estimated to be around 500,000
container moves a year. The PCRC plans to increase this in stages of around 250,000
moves a year, to reach a maximum of 2 million TEU a year. PCRC
will operate the double-stack bulkhead-type rail cars in two sets of six, each
set accommodating an average of 75 containers. A typical mix would comprise 60
X 40' containers and 15 X 20' containers. |